-
IMPACTS10
-
HOURS26
-
GROUPS2
About
GivePulse Stats
Groups
Impacts
Nothing major, just clearing small debris.
Post-storm cleanup, chain saw had already been through, creek completely dry, trail in very good shape, now free of storm debris.
General clean-up of storm debris along Prescot and the loop down to the lake.
U11 - #2 - Builders filled the wet section just below C, looks like soft soil and tough to drain so need to monitor. New jump looks good. Pulled some larger plants and cleared lots of rocks and branches. Some weed-whacking will be needed on the lower section near P but fine for now. My drains holding up well as the organic layer has gone and those sections of trail have returned to mineral.
Section 2 - Storm cleanup.
Built new lake connector with TAP and ticks.
Cleaned all storm debris on Sections 1, 2, 3, & the part of Section 4 along Prescot.
My new drains on the lower Cunningham-Prescot section all working well.
One tree down on Section 2/3 hard to tell, have photo with GPS.
6 ravine area on Section 1 in very bad shape, one washed out, two halfway washed out, and three well on their way. Will need the trail builders back to redo, may need rock armor. Have photos with GPS.
One bad washout on Section 4 that will only get worse if not handled.



