Dave gave to Trailblazers
Section from Chelsea to new bridge. Lopping done, drainage pipe cleaned out, needs about 6 hours weed whacking. Upper trail is very overgrown, but overall the tread is in great shape.
Gave 4.00 hours on 07/13/2020 with Friends of Arkansas Singletrack - FAST

