At MLK MAM:
Put together various furnitures.
In Activity Room: Put up more curtains.
In Girls’ Locker Room:
Completed prep of lockers, cleaning and rehabbing them. Removed dirty football uniforms that have been in lockers since 2018. Yes, really.

Taped walls and floor for spray painting.

Began prep of reefer prior to painting, cleaned exterior and taped gaskets, logo and other areas not wanted to be “Beauty Queen” pink. Taped floor and lower walls.

Gave 10.00 hours on 08/04/2021 with Volunteer Odyssey
DONNA JEFCOAT

At MLK MAM:

Activity Room: Chair rails up. Two pieces of furniture constructed.
Girls’ Locker Room: Moved refrigerator into space. Began taping floor and walls in order to protect them from stray spray paint mist.

Gave 12.00 hours on 08/03/2021 with Volunteer Odyssey
DONNA JEFCOAT

At MAM MLK:

In Activity Room, put up 8 curtain rods. Applied JB weld to exposed, crumbly tile. Wiped down, cleaned one of the HVAC units. Moved large, commercial refrigerator into room.

Mopped up condensation leak from chiller pipe. Placed fans to assist in evaporation. Placed PIG dams around leak. Notified MAM Facilities and Gym Director.

Began to prep lockers in Girls’ Locker Room for spray painting,


Talked with MLK Housekeeping Supervisor. MAM items in choir room that must be removed ASAP. Videoed room and notified MAM Facilities and Gym Director.

Gave 12.00 hours on 08/02/2021 with Volunteer Odyssey
DONNA JEFCOAT

At MAM MLK: Completed installation of rubber cove molding in Activity Room.

Gave 6.00 hours between 07/30/2021 and 07/31/2021 with Volunteer Odyssey
DONNA JEFCOAT

At Activity Room at MAM MLK: Put first coat of oil based paint on door, door frame, baffles and chair rails. Adhered cove molding to half of room.

Gave 6.00 hours on 07/29/2021 with Volunteer Odyssey
DONNA JEFCOAT

At MLK: FINALLY done painting the walls in the Activity Room. Huge space with tall walls and lots of pipes. Scraped 60 years of built up grime off floor, readying it for cove molding. Prepped baffles above HVAC units for painting.

At MAM Leawood: Dropped off more Wall Control accessories.

Gave 6.00 hours on 07/27/2021 with Volunteer Odyssey